Projects
Our work, with the dates and places left on
Every photo here was taken by our crew on our own jobs. The stamp on each one shows where and when. Nothing is stock and nothing is borrowed.
Project pages
17 jobs, each written up with what we did and why
South Philadelphia, PAAug 2025afterSouth Philadelphia, PA · April to August 2025
South Philadelphia rowhome: full renovation, April to August 2025
A brick rowhome taken down to the studs in April and handed back in August. New kitchen, two bathrooms, a rebuilt staircase with iron balusters, vinyl plank floors throughout, a finished basement, new windows, a new front door and a cedar-fenced patio.
South Philadelphia, PAAug 2025afterSouth Philadelphia, PA · May to August 2025
Rowhome staircase rebuilt from the stringers up, South Philadelphia
The old steep staircase came out in April. New stringers, oak treads, painted risers, an oak handrail and iron balusters went in over the summer, with a matching landing railing upstairs.
South Philadelphia, PAAug 2025afterSouth Philadelphia, PA · July to August 2025
Rowhome kitchen remodel: white shaker cabinets and quartz, South Philadelphia
The kitchen at the back of the rowhome was rebuilt with white shaker cabinets to the ceiling, quartz counters, a subway tile backsplash, stainless appliances, a new window over the counter and vinyl plank floors that run straight through from the front room.
South Philadelphia, PAAug 2025afterSouth Philadelphia, PA · May to August 2025
Two bathrooms in one rowhome: a tiled tub bath and a glass shower, South Philadelphia
The house got two finished bathrooms: a full bath with a tub, marble-look porcelain tile floor to ceiling and a lighted mirror, and a compact second bath with grey tile, a curved glass shower enclosure and a wall-hung sink.
Warwick Township (Lititz), PASep 2025duringLititz, PA · September 2025
Basement remodel in Warwick Township, Lititz: plumbing, drywall and a porcelain tile floor
An older basement near Lititz opened up and rebuilt: old ceiling and partitions out, new plumbing lines, new drywall and a marble-look porcelain tile floor laid around the steel support columns. Photographed in progress; finished photos follow when the owner is ready.
PennsylvaniaafterPennsylvania
Weathered wood deck replaced with composite decking
A grey, splintering wood deck on a white-sided home was rebuilt with brown composite boards and new stairs on the same footprint. The frame was inspected and repaired before the first board went down.
PennsylvaniaAug 2023afterPennsylvania · August 2023
Modern farmhouse bathroom, loft railing and a board-and-batten barn door wall
A bathroom with geometric wallpaper, a natural wood door, black-trimmed window and a subway tile shower with a patterned niche, plus an upstairs loft with an oak and iron railing and a dark board-and-batten wall with a sliding barn door.
South Philadelphia, PAAug 2025afterSouth Philadelphia, PA · August 2025
Finishing a rowhome basement: carpet, drop ceiling and closets, South Philadelphia
The basement under the rowhome became a finished room: new drywall, a drop ceiling with flush lights, carpet over the slab, louvered closet doors and carpeted stairs. The last part of the whole-house renovation to be finished.
South Philadelphia, PAAug 2025afterSouth Philadelphia, PA · July to August 2025
Cedar privacy fence, planter and patio behind a South Philadelphia rowhome
The back yard of the rowhome was rebuilt as a small patio: a cedar privacy fence built on site, a matching cedar planter box, both stained a warm red-brown, and the concrete pad cleaned up and planted.
South Philadelphia, PAAug 2025afterSouth Philadelphia, PA · May to August 2025
Replacement windows, a new front door and iron railings on a brick rowhome, South Philadelphia
Every window in the rowhome was replaced with a vinyl double-hung unit, black outside and white inside. The old aluminum awning came down, a new entry door with an oval glass panel went in, and the front steps got new iron railings.
South Philadelphia, PAAug 2025afterSouth Philadelphia, PA · June to August 2025
Vinyl plank floors through a whole rowhome, South Philadelphia
One floor, one direction, every room: grey oak-look vinyl plank laid across the first floor and the bedrooms of the rowhome, with the subfloor flattened first and the planks run front to back to stretch a narrow house.
West Hanover Township (Hershey), PASep 2025afterWest Hanover Township, PA · September 2025
Kitchen update and new stair treads near Hershey, West Hanover Township
Two jobs in one house east of Harrisburg: a straight run of stairs rebuilt with new wood treads and painted risers, and a kitchen update with dark cabinets and a granite island. Photographed in September 2025 with the work in progress.
Heidelberg Township (Schaefferstown), PAJun 2025afterSchaefferstown, PA · May to June 2025
Vinyl plank flooring in a Heidelberg Township living room, near Schaefferstown
Old flooring out, subfloor prepared, light oak-look vinyl plank in across a living room with a brick fireplace, and the furniture back in place within the week. A small job done right, ten minutes from our shop.
PennsylvaniaAug 2022afterPennsylvania · August 2022
New composite deck with white vinyl railings and a wide stair
A new raised deck off the back of a brick and siding ranch home: pressure-treated frame on concrete footings, brown composite decking, white vinyl railings that match the trim, and a wide stair down to the yard.
PennsylvaniaFeb 2023afterPennsylvania · February 2023
Deck resurfacing in February: new composite boards and stairs, original railings kept
A long deck along the side of a house got new brown composite boards and rebuilt stairs on its existing frame, with the original wood railings left in place for a later phase. Done in winter, between the owner's two budget years.
PennsylvaniaSep 2022afterPennsylvania · September 2022
Three black-frame double-hung windows with white casing
A row of three new black-frame double-hung windows with divided lites, installed and cased in white during a room renovation, photographed with the manufacturer labels still on the glass.
Marysville, PASep 2025afterMarysville, PA · September 2025
Board-and-batten screen for an outdoor AC unit, Marysville
A small carpentry job that solves a common problem: a board-and-batten privacy screen around an outdoor air conditioning unit, built with a hinged service door, painted to match the sage-green siding, with the clearance the unit needs to breathe.
More finished work
Kitchens, baths, stairs, decks and more
Finished jobs we have not written up yet. Full project pages are added as we confirm the details with each homeowner.
Pennsylvaniaafter
Pennsylvaniaafter
PennsylvaniaJul 2025after
Pennsylvaniaafter
Free estimate
Want yours to be next?
Send a few lines or call. We will set a time to walk through the house and you will have a written, itemized estimate a few days later.
Monday to Friday, 7:00 am to 5:00 pm